<ruby id="99x7d"><menuitem id="99x7d"></menuitem></ruby>

        <form id="99x7d"><th id="99x7d"><th id="99x7d"></th></th></form>

        <noframes id="99x7d"><form id="99x7d"></form>

        新聞資訊

        首頁>>新聞資訊

        長臂挖掘機出租如何提率?

        日期:2024-03-17   來源:http://www.scinice.com/

        經濟的發展帶動社會各行各業在發展,據不完統計,目前長臂挖掘機的使用已經越來越廣泛,如何提高長臂挖掘機的工作效率,成為很多用戶所頭疼的問題。長臂挖掘機出租公司來給大家來共同分享一下如何提高挖掘機的工作效率。

        The development of the economy drives the development of various industries in society. According to endless statistics, the use of long arm excavators has become increasingly widespread. How to improve the work efficiency of long arm excavators has become a headache for many users. Long arm excavator rental company is here to share with everyone how to improve the work efficiency of excavators.

        1、優先選好駕駛路線;長臂挖掘機在施工組織中應事先擬定好自卸車的行駛路線,不必要的上坡道。對于挖掘機的各掘進道,必須要做到各有一條空車回程道,以免自卸車進出時相互干擾。各運行道應保持良好善,以利自卸車運行。

        2020.3.19(5)

        1. Prioritize selecting driving routes; Long arm excavators should plan the driving route of the dump truck in advance during construction organization, and remove unnecessary uphill slopes. For each excavation lane of the excavator, it is necessary to have an empty return lane to avoid mutual interference when the dump truck enters and exits. Each operating lane should be maintained in good condition to facilitate the operation of the dump truck.

        2、駕駛員技術水平。長臂挖掘機工作效率的高低和駕駛員的操作技術是息息相關的,長臂挖掘機駕駛員應具有熟練的操作技術,并盡量采用復合操作,以縮短挖掘機作業循環時間。

        2. Driver's technical level. The efficiency of a long arm excavator is closely related to the driver's operating skills. The long arm excavator driver should have proficient operating skills and try to use composite operations to shorten the excavator's operating cycle time.

        3、正確進行施工組織設計。挖掘機配合的自卸車數量及承載能力應滿足挖掘機生產能力的要求,且自卸車的容量應為挖掘機鏟斗容量的整數倍。同時盡量采用雙放裝車法,使挖掘機裝滿一輛,緊接著又裝下一輛,由于兩輛自卸車分別停放在挖掘機鏟斗卸土所能及的圓弧線上,這樣鏟斗順轉裝滿且車,反轉又可裝滿另一車,從而提高裝車效率。

        3. Properly carry out construction organization design. The number and carrying capacity of dump trucks matched with excavators should meet the requirements of excavator production capacity, and the capacity of dump trucks should be an integer multiple of the excavator bucket capacity. At the same time, try to use the double loading method, so that the excavator is filled with one vehicle, and then another vehicle is loaded. As the two dump trucks are parked on the arc line that the excavator bucket can reach for unloading soil, the bucket can rotate clockwise to fill the vehicle, and reverse to fill the other vehicle, thereby improving the loading efficiency.

        【本站圖片均由網站所有方提供,部分圖片來源于網絡,如無意中侵犯了某媒體或個人的知識產權,請來信或來電告之,本網站將立即刪除?!?/p> 成人国产精品视频频,国产精品网站在线进入,国产精品视频三区,华人欧美国产在线精品

        <ruby id="99x7d"><menuitem id="99x7d"></menuitem></ruby>

              <form id="99x7d"><th id="99x7d"><th id="99x7d"></th></th></form>

              <noframes id="99x7d"><form id="99x7d"></form>